The Northumberland Dry Stone Wall Festival was held at Garden Hill Acres October 6 - 8, 2007

Extensive "behind the scenes" preparations were required for the DSWAC Festival.  Foundations were dug (approximately 6 to 8 inches deep) and filled with coarse gravel for stability, drainage and ease of leveling the first course.

Over 50 tons of stone were delivered to three different areas -- for the SheepShear, for the Helix and for the Student Wall.

 

Click on any image for full size:

44 Tons of rock...

...on a truck 40 feet long.

The conveyor truck...

...makes unloading easy!
Bringing the load of stone for the Student's Wall
Don & Marguerite pretend they are Wallers
Ready to begin the Student's 30 ft wall
35 Tons of Rock and the Sheep-Shear foundation
Huge slabs will link the strands of the double helix
Huge slabs will link the strands of the double helix
Nine tons ready to start the Double Helix